大伙房水库输水(二期)工程水力过渡过程分析 被引量:3

Analysis of hydraulic transient for water conveyance project(phase Ⅱ) of Dahuofang reservoir
下载PDF
导出
摘要 根据大伙房输水工程布置特点,对输水系统加压泵站不同阀门启闭运行条件下,输水管道内的最大水锤正压和最大水锤负压进行数值研究,考察工程运行安全指标并提出合理的优化设计方案。采用瞬变流模型方程,运用Fortran程序语言编制程序,对水力过渡过程进行数值分析计算。最终给出不同运行工况下阀门启闭方式的推荐方案,并基于各稳压塔溢流量给出稳压塔的修正设计方案。 According to the layout characteristics for water conveyance project of Dahuofang reservoir,the paper studies the maximum water hummer positive and negative pressure of in conveyance pipe,investigates safety operation index of the project,provides rational optimized design scheme under the open and close operation condition of different valves for booster pumping station of conveyance system.The paper presents numerical analysis of hydraulic transient process with transient flow model equation and For tranlanguage programming,and provides the recommended scheme of valve operation for different operational conditions and the correction design scheme of the voltage stabilization tower based on the spillway discharge of kinds of stabilization tower.
作者 李爱华
出处 《东北水利水电》 2011年第3期8-10,23,共4页 Water Resources & Hydropower of Northeast China
关键词 瞬变流模型 水力过渡 数值分析 大伙房输水工程 transient flow model hydraulic transient numerical analysis Dahuofang conveyance project
  • 相关文献

参考文献4

  • 1刘沛清主编.计算水力学[M].郑州:黄河水利出版社,2001.
  • 2清华大学水力学教研室编.水力学[M].北京:高等教育出版社,1995.
  • 3成都科技大学水力学教研室编 吴持恭.水力学[M].北京:高等教育出版社,1980..
  • 4杨开林著.电站与泵站中的水力瞬变及调节[M].北京:中国水利水电出版社,2000.

共引文献2

同被引文献21

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部