宁波南站基桩承载力自平衡静载试验研究及应用

The research and application of the self-balanced static load test of the carrying capacity of the foundation piles in the south station of Ningbo
下载PDF
导出
摘要 文章以宁波火车南站改建工程为背景,采用自平衡试桩法对大直径超长钻孔桩进行静载荷试验,成功而方便地检测大吨位钻孔桩的抗压抗拨承载力、极限端阻力及桩身上下段的极限侧摩阻力。结果表明,测试取得了较好的工程效果,可以在类似工程中推广使用。 Taking the reconstruction project of Ningbo South Railway Station as background, this paper develops the static load test to the large diameter bored piles with self-balanced test piles method, and successful and easily tests the compressive resistance capacity, ultimate tip resistance and the ultimate side friction on the upper and bottom section of the large tonnage bored piles.And the result shows that the test achieves better project effect, and it can be used in similar project.
出处 《企业技术开发》 2010年第12期64-67,70,共5页 Technological Development of Enterprise
关键词 自平衡试桩法 钻孔桩 竖向承载力 self-balanced test piles method bored piles vertical load capacity
  • 相关文献

参考文献10

二级参考文献18

共引文献294

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部