摘要
研究目的:随着我国地铁建设的高速发展,有经验的设计、施工人员相对于全国的地铁市场来说严重不足,笔者通过总结一些以往设计施工的经验教训,希望对刚步入地铁行业的设计施工人员有所帮助。研究结论:本文主要从地铁隧道通风系统、公共区通风空调系统、设备管理用房通风空调系统和空调水系统等几方面对地铁设计及施工中容易忽略和需要重点注意的一些问题加以总结性分析说明。
Research purposes: With the rapid development of subway construction in China,the experienced designer and construction workers are not enough for design and construction of subway.This paper summarizes the experience and lessons in design and construction of subway for the purpose of giving a hand to the fresh designers and construction workers of subway. Research conclusions:In this paper,the analysis and explanation are made and given to the problems that are ignored easily and needed for caution in subway design and construction from the aspects of the ventilation systems for subway tunnel,the ventilation and air conditioning systems for public areas and the ventilation and air-conditioning systems and air-conditioning water system for equipment control rooms.
出处
《铁道工程学报》
EI
北大核心
2011年第4期94-96,共3页
Journal of Railway Engineering Society
关键词
区间隧道通风系统
公共区通风空调系统
设备管理用房通风空调系统
空调水系统
ventilation systems for section tunnel
ventilation and air conditioning systems for public areas
ventilation and air conditioning systems for equipment control rooms
air-conditioning water system