期刊文献+

辽宁棕壤区开发建设项目弃土流失特征研究 被引量:9

Research on Spoil from Construction Projects of Brown Earth in Liaoning
下载PDF
导出
摘要 弃土场是开发建设项目中最重要的水土流失来源之一。以辽宁省沈阳市某电厂剥离表土临时堆土为对象,研究棕壤地区开发建项目设弃土的流失规律。试验在沈阳农业大学水利学院综合试验基地的人工模拟降雨试验大厅内进行,共设5个雨强、5个坡度,雨强分别为0.38,0.64,1.05,1.24,1.50 mm/min,坡度分别设定为20°,25°,30°,35°,40°。研究结果表明,相同条件下,雨强越大坡面产流时间越短,坡面土壤水分入渗率随雨强的增加而增加,且雨强越大坡面初始入渗率越高;径流量随雨强的增加而增加。在不同雨强条件下径流量变化呈现不同规律,小雨强条件下增加较平缓;大雨强条件下,径流量呈波动性增加。相同条件下,随着坡度的增加产流时间逐渐缩短,坡面降雨入渗率随坡度的增大有增大的趋势。 Slope is researched extensively as an important factor to produce erosion which influenced on the infiltration,runoff and sediment significantly.Dumping sites for construction of the project is to develop the most important source of soil erosion.This article studied spoil Brown's loss law by using the surface soil in a power plant in Shenyang city,Liaoning province.Erosion and sediment yield process of soil dumped by people have been analyzed by simulated rainfall experiments.Rainfall intensity was set as 0.38,0.64,1.05,1.24,1.50 mm/min,and slope was set as 20°,25°,30°,35°,40°.The results showed that under the same conditions,the greater it rained,the shorter runoff-yielding time extended,infiltration rate increased with raininess especially initially.The same law appeared in run-off.In different conditions,runoff showed different law.It increased more slowly at low rain intensity while showed increased volatility at high rain intensity.Under the same conditions,time of reducing runoff became short with the increasing slope while infiltration rate increased in the slope.
出处 《水土保持学报》 CSCD 北大核心 2011年第2期63-66,71,共5页 Journal of Soil and Water Conservation
基金 国家自然基金(41071183) 辽宁省博士启动基金(20081070)
关键词 棕壤 开发建设 弃土场 水土流失 人工模拟 brown earth development and construction spoil soil erosion artificial simulation
  • 相关文献

参考文献12

二级参考文献89

共引文献248

同被引文献118

引证文献9

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部