期刊文献+

富水砂卵石地层土压平衡盾构施工滞后沉降分析及预防控制措施 被引量:7

Analysis on delayed settlement induced by EPB shield tunneling in water-rich sandy cobble stratum and prevention and control measures
下载PDF
导出
摘要 成都地铁富水砂卵石地层采用土压平衡盾构法施工时,存在着比较特殊的滞后沉降现象。结合成都地铁施工的实践经验,分析了富水砂卵石地层施工滞后沉降的产生机理,研究并总结了预防控制滞后沉降的措施,为国内类似工程滞后沉降的预防控制进行了初步的探索。 Special delayed settlement appeared when EPB shield tunneling method was used in the water-rich sandy cobble stratum in Chengdu Subway.This paper analyzes the cause for the delayed settlement in water-rich sandy cobble stratum,researches and concludes the prevention and control measures for the delayed settlement based on the construction experience in Chengdu Subway project.It sheds light on similar prevention and control measures for the delayed settlement in China.
作者 宋立德
出处 《长春工程学院学报(自然科学版)》 2011年第1期28-30,共3页 Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词 富水砂卵石地层 土压平衡盾构施工 滞后沉降 water-rich sandy cobble stratum EPB shield tunneling delayed settlement
  • 相关文献

参考文献2

二级参考文献5

共引文献34

同被引文献59

引证文献7

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部