以成渝高速公路复线(重庆境)F合同段路基工程为例,从施工工艺流程入手,详细介绍了抗滑桩施工工艺及各工序操作要点,并对其质量控制措施进行了具体阐述,为今后同类公路边坡治理工程积累了宝贵经验。
Taking the foundation project of F contract section along Chengdu-Chongqing expressway's double track(Chongqing borders)as the example,the paper from the construction craft procedures,introduces the construction craft of anti-slide pile and its operation points in all steps,and illustrates the quality control measures,so as to accumulate the precious experience for the side slope treatment projects on similar roads.
出处
《山西建筑》
2011年第15期81-82,共2页
Shanxi Architecture
关键词
抗滑桩
施工工艺
质量控制措施
anti-slide pile
construction craft
quality control measures