伶仃航道三期试挖槽工程实施后泥沙回淤分析 被引量:2

vAnalysis of sedimentation after implementation of Lingding channel phase Ⅲ trial dredging engineering
下载PDF
导出
摘要 在对伶仃洋河口湾来水来沙、潮汐与潮流特性分析的基础上,结合伶仃航道三期工程实施后的4次航道地形测量资料,对试挖航段的回淤量沿时间和空间的变化、以及航道稳定边坡进行分析。结果表明伶仃航道开挖段-15.5 m贯通后,经过2008年1月—2009年1月水沙过程的作用后(其间未进行疏浚),航道内以淤积为主,淤积量较以往(一、二期)没有明显增加。此结论为三期工程的进一步拓宽浚深提供了技术参考。 Based on the analysis of the incoming water and sediment,tide and tidal current characteristics in the Lingdingyang estuary,and combining with four times topographic survey data after phase Ⅲ project of Lingding channel,this paper analyzes the spatial-temporal variation of channel's siltation amount and slope stability.The results shows that after the transfixion of the 15.5 m dredged channel in Lingdingyang bay,and the flow and sediment process between January 2008 and January 2009(the channel was not dredged during this period),the channel's main tendency was silting-up,but the sedimentation amount was not increased comparing with the previous project(phaseⅠand Ⅱ).The result presents a technical reference for further widening and deepening of the channel in phase Ⅲ project.
出处 《水运工程》 北大核心 2011年第4期93-97,共5页 Port & Waterway Engineering
关键词 伶仃航道 挖槽 回淤量 Lingding channel dredging amount of siltation
  • 相关文献

参考文献11

二级参考文献36

共引文献54

同被引文献17

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部