空气涡轮机带负载启动过程仿真 被引量:10

Simulation of Startup Process of Air Turbine with Load
下载PDF
导出
摘要 涡轮泵发射系统是目前世界上海军现役潜艇最先进的液压平衡式深水发射装置。空气涡轮机是涡轮泵发射系统的动力核心。为深入研究该涡轮机的工作特性,为进一步的研发工作奠定理论基础,运用热力学、空气动力学等理论建立空气涡轮机及其辅助系统的仿真模型,根据仿真模型编制仿真软件,进行空气涡轮机启动过程的动态仿真,并对仿真结果进行析。仿真结果表明,空气涡轮机带负载的启动特性可满足涡轮泵发射系统的要求。该模型不仅可用于该涡轮机的仿真研究以摸索其工作特性,其仿真结果还可为试验样机的总体设计及其试验的提供理论依据。 Air turbine is the power unit of the hydraulic balanced torpedo launch system which is the most advanced launch system in active service.In order to evaluate the performance of the air turbine,models of the start process for air turbine and supporting system are modeled on the basis of theories of thermodynamics and aerodynamics,the simulation software is developed,and the simulation results are analyzed.The simulation results show that the startup performance of the air turbine can match the air turbine pump torpedo launch system.These models not only can be a theoretical basis in the process of designing and manufacturing this launch system,but also can be used to analyze the operation principles of the air turbine pump torpedo launch system.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2011年第8期191-198,共8页 Journal of Mechanical Engineering
关键词 空气涡轮机 旋转水泵 涡轮泵发射系统 仿真 Air turbine Rotary pump Air turbine pump torpedo launch system Simulation
  • 相关文献

参考文献7

二级参考文献24

  • 1王仲奇,韩万今,徐文远,赵桂林.在低展弦比透平静叶栅中叶片的弯曲作用[J].工程热物理学报,1990,11(3):255-262. 被引量:35
  • 2陈文振,孙丰瑞,陈林根.热源间定常态能量转换热机的面积特性[J].工程热物理学报,1990,11(4):365-368. 被引量:18
  • 3NAKAGKI T, OGAWA T. Development of chemically recuperated micro Gas turbine[ J ]. Journal of Engineering for Gas Turbines and Power, 2003,125:391 -397.
  • 4KESSER K F, HOFFMAN J W. Analysis of a basic chemically recuperated gas turbine power plant [ J ]. ASME Journal of Engineering for Gas Turbines and Power, 1994,116:277 - 284.
  • 5CARAPELLUCCI R, MILAZZO A. Thermodynamic optimization of a reheat chemically recuperated gas turbine [ J ]. Energy Conversion and Management, 2005,46: 2936 - 2953.
  • 6HARVEY S, KANE N. Analysis of a reheat gas turbine cycle with chemical recuperation using ASPEN [ J ]. Energy Convers, Mgml, 1997,38 ( 15 - 17 ) : 1671 - 1679.
  • 7CAI Ruixian, JIANG Lixia. Analysis of the recuperative gas turbine cycle with a recuperator located betweem turbines [ J ]. Applied Thermal Engineering,2006, ( 26 ) : 89 - 96.
  • 8ALMAN S T, HOFFMAN M A. A methane-steam reformer for a basic chemically recuperated gas turbine [ J]. Transactions of the ASME, 1995,117 : 16 - 22.
  • 9[3] 李艳军.潜艇鱼雷深水发射装置研究[D].武汉:海军工程大学,1993.
  • 10汪玉.舰用燃气轮机的实时仿真数学模型.热能动力工程,1988,3(5):1-6.

共引文献16

同被引文献76

引证文献10

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部