延迟焦化装置中带碟簧的管法兰接头三维数值分析 被引量:3

Three-Dimensional Numerical Analysis for the Pipe Flanged Jiont with Belleville Spring in Delayed Coking Unit
下载PDF
导出
摘要 应用有限元法分析延迟焦化装置中焦炭塔和管道的受力和变形,并针对生焦高温工况,对带有碟形弹簧的管法兰接头进行三维数值模拟,分析碟形弹簧对垫片应力的影响。模拟结果表明,生焦时焦炭塔受高温膨胀,导致管道弯曲变形,而内压对此影响相对要小很多;高温下选用适当的碟形弹簧,有利于维持管法兰接头的垫片工作应力。 FEA was used to analyze the force and deformation of coke tower and the pipe in delayed coking unit. Three - dimensional numerical analysis for the pipe flanged joint with belleville spring was carfled on to investigate belleville spring's effects on gasket stress under the elevated temperature condition than the pressure's. Proper use of belleville spring is more favourable for maintaining the working stress of gasket of the pipe flanged joint under the condition of elevated temperature.
出处 《压力容器》 北大核心 2011年第5期15-20,共6页 Pressure Vessel Technology
关键词 有限元 延迟焦化 高温 碟形弹簧 垫片应力 FEA delayed eoking elevated temperature belleville spring gasket stress
  • 相关文献

参考文献1

共引文献40

同被引文献28

  • 1王俊和,蔡仁良,钟伟明.在稳态温度场中法兰接头的三维有限元分析[J].压力容器,2005,22(10):18-22. 被引量:11
  • 2李国君,马晓永,李军.非轴对称端壁成型及其对叶栅损失影响的数值研究[J].西安交通大学学报,2005,39(11):1169-1172. 被引量:52
  • 3GB150-2011,压力容器[S].
  • 4JB 4710-2005,钢制塔式容器[S].
  • 5GB150-2011,压力容器[S].北京,中国国家标准化管理委员会,2011.
  • 6JB4732-1995钢制压力容器-分析设计标准(2005年确认)[S].2005.
  • 7合肥通用机械研究院特种设备检验站.焦炭塔检验报告[R].2012.4.
  • 8Howell A R. Fluid dynamics of axial compressor [ J ]. Proceeding of the Institution of Mechanical Engineers, 1945,153:441-452.
  • 9ROSE M G. Non-axisymmetric endwall profiling in the HP NGVs of an axial flow gas turbine [ R ]. ASME 94- GT-249,1994.
  • 10Harvey N W, Rose M G. Non-axisymmetric turbine endwaU design:three2dimensional linear design system [ C]. Proceedings of ASME Turbo Expo 1999 Power for Land, Sea & Air, New York, USA, 1999.

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部