期刊文献+

泸定水电站大坝接触黏土料碾压试验及成果分析 被引量:2

Rolling Test and Analysis of Contacting Clay Material for Luding Dam
下载PDF
导出
摘要 为验证大坝心墙接触黏土料的设计填筑标准,确定经济合理的碾压施工参数,选择适宜的碾压机械设备,以确保大坝碾压作业的施工质量,进行了心墙接触黏土料现场碾压试验。试验成果表明,选用的机械、机具及工艺满足现场碾压要求;该区域土体属中压缩性土,具中等偏下抗剪强度,极微透水性,土料适宜用于心墙接触黏土填筑。 The on-site rolling tests of contacting clay material for dam core wall construction in Luding Hydropower Station are conducted for verifying the designed filling criteria of contacting clay material, determining the economic rolling parameters and selecting appropriate rolling machineries and equipments. The results show that the selected rolling machineries and equipments and roiling technology can meet the requirements on on-site rolling construction, and the soil is middle compressible with lower-middle shear strength and very small permeable and is suitable for the filling of contacting clay.
出处 《水力发电》 北大核心 2011年第5期74-76,79,共4页 Water Power
关键词 接触黏土料 碾压试验 成果 泸定水电站 contacting clay material rolling test resuh Luding Hydropower Station
  • 相关文献

参考文献6

二级参考文献2

  • 1DL/T 5129-2001,碾压式土石坝施工规范[S].北京:中国电力出版社,2001.
  • 2SL274-2001碾压式土石坝设计规范[S].北京:中国水利水电出版社,2002:36-41.

共引文献44

同被引文献9

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部