期刊文献+

模糊层次分析法在盾构机型优选中的应用 被引量:4

Application of Fuzzy Analytical Hierarchy Process(FAHP) in the Optimum Selection of Shield Machine
下载PDF
导出
摘要 盾构穿越工程中,选用合适的盾构机型以适应复杂多变的地质条件与施工要求至关重要,但目前多依靠施工经验定性判断。引入定性评价与定量分析相结合的模糊层次分析法(FAHP),通过建立递阶层次模型、确定模糊一致矩阵、计算指标权重3个步骤进行盾构机型的优选。该方法在宜昌长江盾构穿越中的成功应用表明,建立递阶层次模型是FAHP的关键环节;指标权重仅具有相对意义,用于对比排序,其数值没有实际的物理意义。 Selection of the appropriate shield machine to fit complex layers and construction requirements is critical for shield crossing projects while it is finished qualitatively according to construction experience at present.The paper presents that the fuzzy analytical hierarchy process(FAHP) and the optimum selection of shield is done in terms of qualitative evaluation and quantitative calculation by 3 steps which include establishing the hierarchical model,determining the fuzzy consistent matrix and calculating index weights.The successful application of FAHP in Yangtze River shield crossing project in Yichang shows that the essential part of FAHP is the establishment of hierarchical model.The comprehensive index weight whose value has no real physical meaning is only used for comparing and sorting.
出处 《探矿工程(岩土钻掘工程)》 2011年第5期70-73,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 模糊层次分析法 盾构 优选 矩阵 权重 FAHP shield optimization matrix weight
  • 相关文献

参考文献13

二级参考文献53

共引文献1600

同被引文献33

  • 1翟强,顾伟红.硬岩隧道掘进机滚刀破岩性能评价研究[J].水资源与水工程学报,2020(5):225-234. 被引量:7
  • 2魏效玲,曹庆奎,潘越.产品性能评价模型研究[J].机械工程学报,2004,40(6):91-94. 被引量:20
  • 3朱齐平,刘希太,潘存治.全断面掘进机(TBM)刀盘总推进力的分析计算[J].矿山机械,2006,34(11):20-21. 被引量:8
  • 4宋克志,王本福.常见盾构刀盘型式及选用[J].筑路机械与施工机械化,2007,24(6):44-46. 被引量:47
  • 5VINAl R, OGGERI C, PElLA D. Soil conditioning of sand for EPB applications: A laboratory research[J]. Tunneling and Underground Space Technology, 2008, 23(3): 308-317.
  • 6MROUEH H, SHAHROURI. A Simplified 3D model for tunnel construction using tunnel boring machines[J]. Tunneling and Underground Space Technology, 2008,23(1): 38-45.
  • 7LAMBRUGHI A, MEDINA RL, CASTELLANZA R. Development and validation of a 3D numerical model for TBM - EPB mechanised excavations[J]. Computers and Geotechnics, 2012, 40: 97-113.
  • 8PEILAD, PICCHIOA, CHIEREGATOA. Earth pressure balance tunnelling in rock masses: Laboratory feasibility study of the conditioning process[J]. Tunnelling and Underground Space Technology, 2013, 35: 55-66.
  • 9SHI Hu, YANG Huayong, GONG Guofang, et al. Determination of the cutterhead torque for EPB shield tunneling machine[ J]. Automation in Construction, 2011, 20(8): 1087-1095.
  • 10YAZDANI-CHAMZINI A, YAKHCHALI S H. Tunnel boring machine (TBM) selection using fuzzy multicriteria decision making methods[J].Tunnelling and Underground Space Technology, 2012, 30: 194-204.

引证文献4

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部