文中通过对湖北金井嘴金矿建设项目的经济评价研究,分析我国黄金矿山建设项目的现状,存在的问题,将研究的着力点放在黄金矿山建设项目经济评价方法上,运用定性与定量相结合的方法,在不确定性分析的基础上进行方案比较,采取风险规避的措施,使项目最优可行。
Through study on economic evaluation of the construction project of Jin Jing Zui Gold Mine of Hubei Province,the status quo of the construction projects of gold mines in China and the existing problems are analysed.The emphasis of the study is placed pn the methed of economic evaluation of gold mine′s construction project.On the basis of the analysis of uncertain factors,comparison between construction programs can be made by using the method of combining qualitative and quantitative analysed.At the same time,measures of evoding risk should be taken so that the construction project is feasible and optimal.
出处
《黄金》
CAS
北大核心
1999年第9期52-55,共4页
Gold