摘要
This paper analyses the leakage of the seal belts in the middle pass partition,corrosive cracking of lined plate of the channel,tightness of the tubesheet and the flanges and puts forward the plan of the technical improvement.Excellent results have obtained after the execution of the plan.
This paper analyses the leakage of the seal belts in the middle pass partition,corrosive cracking of lined plate of the channel,tightness of the tubesheet and the flanges and puts forward the plan of the technical improvement.Excellent results have obtained after the execution of the plan.
出处
《压力容器》
1999年第5期70-73,30,共5页
Pressure Vessel Technology