曹妃甸工业区供水工程取水泵站启动过渡过程分析 被引量:1

Water Intake Pumping Station Starting Transition Process of Caofeidian Industrial Area Water Supply Project
下载PDF
导出
摘要 针对曹妃甸工业区供水工程管线长、沿线地面高程变化大、管道爆管后损失严重的特点,分析事故停泵后备用泵投入运行和全部机组停机后的启动过渡过程中水力要素的变化幅度及对管道压力的影响,分析管道压力过大的原因,并采取相应的解决措施,确保管道安全运行。 This article countered the features of long pipeline,large elevation change along the ground and serious loss after the pipeline loss of the water supply engineering in Caofeidian Industry Zone,analysing the amplitude of hydraulic elements and the effects to pipeline pressure when the standby pump put into operation after accident and the process of starting the transition process after all the unit shutdown,as well as the cause of excessive pressure for pipeline,and take relevant solutions to ensure the safe operation of the pipeline.
作者 周维海
出处 《水科学与工程技术》 2011年第2期82-83,共2页 Water Sciences and Engineering Technology
关键词 泵站 输水管线 备用泵 启动过渡 pumping station water pipeline standby pump start the transition
  • 相关文献

参考文献4

二级参考文献3

  • 1杨建国,郭仁宁,郑春祥,刘鹏虎.矿井排水装置吸水管路的合理确定[J].阜新矿业学院学报,1995,14(3):84-86. 被引量:2
  • 2聂梅生 等.水工业工程设计手册-水资源及给水处理[M].中国建筑工业出版社,2001.12.
  • 3Fabián A Bombardelli,Marcelo H Garcia.Hydraulic design of large-diameter pipes.Journal of Hydraulic Engineering(c)ASCE,2003,129 (11):839~ 846

共引文献31

同被引文献6

引证文献1

二级引证文献1