摘要
杭州湾跨海大桥北航道桥为双塔双索面斜拉桥,主跨长448m,索塔为钻石型空间结构,索塔总高度为178.8m。本文主要介绍ZPM-100型液压自爬模的主要结构体系、功能和工作原理及在杭州湾跨海大桥北航道桥主塔施工中的运用。
The north navigable span bridge is twin-pylon double-plane-cable-stayed bridge with the main span 448 meters, cable bent tower is diamond space structure and has a height of 178.8 meters. This paper introduces the main architecture, function, working principle of ZPM-100 hydraulic self-climbing formwork and its application to north channel bridge of Hangzhou bay bridge.
出处
《建筑机械化》
2011年第6期54-57,7,共4页
Construction Mechanization