超大直径盾构隧道管片上浮原因与对策分析 被引量:18

An Analysis of Causes and Countermeasures of Segment Floating of Super Large Diameter Shield Tunnels
下载PDF
导出
摘要 超大直径盾构隧道管片的抗浮问题是其普及化的瓶颈.系统总结和分析了管片上浮的原因和机理:包括地质条件、盾构工法特性及施工参数、盾构姿态、覆土厚度、管片接头、施工扰动、注浆工艺和浆液特性等.并就控制超大直径盾构隧道管片上浮提出了具体措施,以期能对超大断面的水底隧道、地铁区间隧道的浅覆土盾构施工起到借鉴作用. Because of its anti-floating problem,super large diameter shield tunnel segment finds itself difficult to gain popularization.The analysis suggests that performances and mechanism of segment floating are closely related to geological condition,characteristics and construction parameters of shield construction,shield attitude,covering depth,joints of segment,construction disturbance,grouting technology,grout characteristics,and the like.Moreover,some concrete countermeasures are proposed to control the uplift of the super lager diameter shield tunnel segments,with a view to yielding some insights into construction of shallow covering shield in underwater tunnels and metro tunnels with super large diameters.
出处 《南京工程学院学报(自然科学版)》 2011年第1期26-31,共6页 Journal of Nanjing Institute of Technology(Natural Science Edition)
基金 住房与城乡建设部科研项目(2009-K3-2)
关键词 超大直径盾构隧道 管片上浮 机理 抗浮措施 super large diameter shield tunnel segment floating mechanism anti-floating countermeasure
  • 相关文献

参考文献9

二级参考文献22

共引文献265

同被引文献122

引证文献18

二级引证文献132

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部