期刊文献+

基于遗传算法的两阶段建筑工程多目标优化 被引量:3

Comprehensive optimization for multiple objectives in construction based on GA
下载PDF
导出
摘要 由于现阶段对资源的均衡操作大都侧重于对工期-资源同时优化,很少涉及质量和成本,所以这里提出了一个两阶段优化模型,第一阶段是基于工期、质量和成本三个目标为非线性关系,建立三个目标的综合优化模型;第二阶段是从上阶段对所得到的非劣解中由决策者选择一个或多个满意的解输入到本阶段进行资源均衡优化,两阶段均用遗传算法求解,最后通过一个实例证明了两阶段模型的可行性与优越性. As most of the way of resource leveling is focused on time-resource trade off,very little is involved in the quality and cost,a two-stage optimization model is proposed:synthesis optimization models is established based on the relationship of the time,the quality.The cost is the misalignment,and it uses chromosomes which are built up by mode to carry on the heredity operation.The second stage is to choose a non-poor solution obtained from the decision-maker from the first stage inputs to this stage to carriy on the resource leveling optimization.It takes time in resources variance minimum as the objective function,and the gene value which is non-critical process's beginning time to make up the chromosome to carry on the heredity operation.An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating and visualizing optimal tradeoffs during construction time,cost,quality,and resource.
出处 《西安建筑科技大学学报(自然科学版)》 CSCD 北大核心 2011年第3期410-416,共7页 Journal of Xi'an University of Architecture & Technology(Natural Science Edition)
关键词 综合优化 建筑工程 遗传算法 资源均衡 comprehensive optimization construction engineering GA resource balance
  • 相关文献

参考文献11

二级参考文献48

  • 1张跃.燃气空调是中国空调发展方向[J].制冷与空调,2000,0(1):7-10. 被引量:1
  • 2郁文红,杨昭.采暖居住建筑节能改造收益分析[J].节能,2004,23(12):21-23. 被引量:7
  • 3杨志明,胡昊.基于能源成本分析的居住建筑节能推广研究[J].西安建筑科技大学学报(自然科学版),2007,39(3):414-418. 被引量:17
  • 4玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 5建筑施工手册编写组.建筑施工手册[S].北京,2000.7.
  • 6屈宏乐.我国建筑节能工作的现状和经验[N].中国建材报,2008-01-07.
  • 7中国城镇节能建筑已达7%[N].人民日报(海外版),2007-1-19(2).
  • 8涂逢祥.我国建筑能耗与发达国家有多大差距.太阳能,2003,(1):11-11.
  • 9Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.
  • 10Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.

共引文献287

同被引文献29

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部