期刊文献+

油气管道完整性管理体系分析与应用 被引量:7

Analysis and Application of Integrity Management System on Oil-Gas Pipeline
下载PDF
导出
摘要 概述了油气管道完整性管理体系的相关内容,分析了其内部关系及与HSE管理体系的关系,并介绍了油气管道完整性管理体系在服役管道中的应用,即可将服役管道划分为3个阶段(幼年故障期、近似稳定故障期、老年故障期),针对每个阶段的不同特点,对完整性管理体系进行优化,以达到投入最低化、效果最大化的目的。可见,在油气管道领域中建立管道完整性管理体系是一种全面高效的管理手段,它为管道的安全运行提供了保障。 This paper outlines the related content of an integrity management system on oil-gas pipeline.It also analyzed its internal relationship and the relations with HSE management.It also introduces the application of integrity management system to service pipelines.In other words,this paper can divide the service pipeline into three stages(the period of childhood failure,the period of similar stability failure and the period of old-age failure).Based on the different characteristics at each stage,this paper can optimize the integrity management system,in order to achieve the goal of minimized investment and maximized effect.Obviously,establishing pipeline integrity management system in the field of oil-gas pipelines is a comprehensive and efficient management tool.This system guarantees the pipeline to safely run.
出处 《管道技术与设备》 CAS 2011年第3期7-8,16,共3页 Pipeline Technique and Equipment
关键词 管道 完整性 管理体系 pipeline integrity management system
  • 相关文献

参考文献5

二级参考文献38

  • 1郭太峰,金麒,窦新华.漏磁检测中的表面裂纹分析[J].工程建设与档案,2005,19(2):134-135. 被引量:3
  • 2张培俊.漏磁检测技术在工业管道上的应用[J].压力容器,2005,22(6):49-51. 被引量:5
  • 3郑岗,赵亮.金属厚度的脉冲涡流无损检测研究[J].传感器与微系统,2006,25(4):35-37. 被引量:28
  • 4陈江(译).含缺陷核压力容器及管道的完整性评定规程[M].上海:华东化工学院出版社,1991..
  • 5Ainsworth R A,Bannister A C,Zerbst U.An overview of the European flaw assessment procedure SINTAP and its validation[J].International Journal of Pressure Vessels and Piping, 2000,(77): 869-876.
  • 6Beighle B D,Gloven P. Relative Risk assessment-The competitive advantage[A].Proceedings of the Interntional Pipeline Conference[C].ASME: 1998.
  • 7Grimes Kiife after inspection[A].Proceedings of the International Pipeline Conference[C].ASME: 1998.
  • 8IIW.Guidance on assessment of the fitness for purpose of welded structures[R].Draft for development, IIW/IIS-SST-1157-90.
  • 9Budden P J,Sharples J K, Dowling A R.The R6 procedure:recent developments and comparison with alterative approaches[J].International Journal of Pressure Vessels and Piping, 2000,(77): 895-903.
  • 10Anderson T L,Osage D A.A comprehensive fitness-for-service guide[J].International Journal of Pressure Vessels and Piping,2000, (77):953-963 .

共引文献164

同被引文献64

引证文献7

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部