摘要
介绍了龚嘴水电站厂房渗漏排水系统的改造。结合电站实际渗漏水量大、水质含油、泥沙多等特点,采用先进的PLC自动测控系统,重点进行了污水深井泵研制和布置设计改进。从而保证了电站安全生产。可供有关水电站借鉴和参考。
Reconstruction of drainage system for seepage from powerhouse at Gongzui Power plant is introduced. Due to actual large seepage flow, oil -laden flow and abundant sediment. development and arrangement design improvement for sewagesump pump are performed by advanced PLC auto-measuring and controlling system, thus ensuring safe operation of the hydropower station, which isused as reference for the similar projects.
出处
《四川水力发电》
1999年第4期41-45,共5页
Sichuan Hydropower
关键词
水电站
厂房渗漏
排水系统
布置设计
Gongzui hydropower station
seepage from powerhouse
drainage system
arrangement design
sewage sump pump