6M E Marchetti. Specific design problems related to bridges built using the incremental launching method [J]. Engineering Structures, 1984,6(3).
7Saptarshi Sasmal, K Ramanjaneyulu. Transfer matrix method for construction phase analysis of incrementally launched prestressed concrete bridges [J]. Engineering Structures, 2006,28(13).
8Hyo-Nam Cho, Young-Min Choi, Byung-Choon Sho. Field load testing and reliability-based integrity assessment of segmental PC box girder bridges before opening to traffic[J]. Engineering Structures, 1998,20(11).