广州亚运海心沙工程的风险识别与对策

Risk Identification and Countermeasure of Guangzhou Asian Game Haixinsha Project
原文传递
导出
摘要 介绍海心沙工程具有的特性以及存在的风险的主要原因,即该工程与一般大型工程相比,具有显著的政治性、工程量超大、工期极短、困难很多、协调困难等五个方面的主要风险。在分析风险因素的基础上,采取相应的组织体制、技术保障、合同约束与项目文化等对应措施,实现工程的预期目标。 Some characteristics of Haixinsha engineering project are introduced.Risks in the project are analyzed.Comparing with general large engineering,there are five sorts risks,which are political risk,huge workload,limited worktime,many difficulty and corresponding hard each other.Some countermeasures to these risks are set up by or-ganizational rules,techniques,contract and project culture,in order to achieve expected target.
出处 《建筑经济》 2011年第7期17-19,共3页 Construction Economy
关键词 亚运工程 风险 对策 控制 Asia game construction project risk countermeasure control
  • 相关文献

参考文献4

二级参考文献13

  • 1Hamimes Y Y.风险建模、评估和管理[M].胡平,译.2版.西安:西安交通大学出版社,2007:84-86,267-276.
  • 2Haimes Y Y. Hierarchical holographic modeling [ J ]. IEEE Transactions on Systems, Man, and Cybernetics, 1981 (9) :606 - 617.
  • 3Haimes Y Y, Lambert J, Li Duan, et al. Hierarchical holographic modeling for risk identification in complex systems [ C ]//Proceedings of the IEEE International Conference on Systems, Man and Cybernetics. Piscataway, NJ : IEEE, 1995,2 : 1027 - 1032.
  • 4ChanKong V, Haimes Y Y, Rosenkranz H S, et al. The carcinogenicity prediction and battery selection ( CPBS ) method : A Bayesian approach[ J ]. Mutation Research, 1985 ( 153 ) : 135 - 166.
  • 5邱菀华.管理决策与应用熵学[M].北京:机械工业出版社,2001..
  • 6Project Management Institute A Guide to the Project Management Body of Knowledge PMI, Inc. 2000
  • 7A. Uchechukwu Elinwa and Silas A. Buba. Construction Cost Factors in Nigeria. Journal of construction engineering and Management, Vol. 119 No. 4, 1993, pp698~713
  • 8L Y Shen. Project risk management in Hong Kong. International. Journal of Project management, Vol. 15No. 2, 1997, pp 101 ~ 105
  • 9Daniel W M Chan and Mohan M Kumaraswamy. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project management, Vol. 15 No. 1, 1997, pp55~63
  • 10Chalabi F A and Camp D. Causes of delays and overruns of construction projects in developing countries. Proeeedings of the CIB, W65 Vol. 3, 1984, pp723~734

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部