结合秦岭隧道和太平驿引水隧洞施工 ,作者对岩爆发生的机理、条件、预测及防治措施进行了系统分析研究 ,提出了一整套行之有效的解决措施 。
Combined with the construction of the Qinling Tunnel and the Taipingyi Head Drift in Sichuan Province, the author puts forward the systematical analysis and research on the mechanism, conditions, forecast and preventive methods for the rock burst occurred during the construction works. A series of effective solving measures are proposed. They may be applied effectively and useful as reference.