大跨度井格梁屋盖高支模施工技术 被引量:12

HIGH FORMWORK CONSTRUCTION TECHNIQUE OF WIDE-SPAN CROSS BEAM ROOF
下载PDF
导出
摘要 南京造币厂行业备件中心立体仓库高跨井格梁屋盖工程,按照制订的高跨扣件式落地钢管排架满堂支撑专项施工方案施工,上部井格梁屋盖混凝土一次性浇筑完毕,排架支撑模板按规定拆除,施工中未发生安全事故,经专家组的检查和最终验收,排架整体稳定可靠,符合设计及规范要求,为今后施工同类型结构工程积累了经验。 The high span cross beam roof engineering of Stereoscopic Warehouse of Industry Spare Parts Center of Nanjing Mint Co., Ltd. is carried out according to the special construction scheme of supporting by full-house high span fastener type ground steel pipe frame bent. One-off concrete pouring is adopted for top cross beam roof and the frame supporting formworks are dismantled in accordance with the provisions. No safety accident happened during the construction. After inspection and final acceptance by the expert group, the frame bent is stable and reliable, satisfying the design requirements and the requirements of codes. Experiences are accumulated for construction of similar structural works in the future
出处 《建筑技术》 北大核心 2011年第8期692-694,共3页 Architecture Technology
关键词 排架支撑 高支模 屋盖 井格梁 模板 frame bent supporting high formwork roof cross beam formwork
  • 相关文献

参考文献5

二级参考文献9

  • 1建筑施工手册[M].第四版.北京:中国建筑工业出版社,2008.
  • 2建筑施工模板安全技术规范[M].北京:中国建筑工业出版社,2008.
  • 3混凝土结构工程施工质量验收规范[M].北京:中国建筑工业出版社,2002.
  • 4JGJ130-2001.建筑施工扣件式钢管脚手架安全技术规范[S].[S].,..
  • 5JGJ130-2001.建筑施工扣件式钢管脚手架安全技术规范.[S].,..
  • 6DG/TJ08-016-2004,钢管扣件水平模板的支撑系统安全技术规程[S].
  • 7杜荣军.建筑施工脚手架使用手册(第一版).北京:中国建筑工业出版社出版,1997.
  • 8建筑施工手册(第三版).北京:中国建筑工业出版社出版,1999.
  • 9DJ101-62-2002 北京市建筑工程施工安全操作规程.

共引文献289

同被引文献30

引证文献12

二级引证文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部