摘要 海底管道在海洋石油天然气的运输方面起到越来越重要的作用,但随着铺管海域水深的增加,对海底管道的铺设方法和主要铺设工具——铺管船也提出了更高的要求.文章介绍了目前普遍使用的几种深水铺管船的船型特点及铺管方法,并以ABS规范为基准,详细说明了深水铺管船入级在总体、结构、舾装等方面应达到的各项要求. Subsea pipelines are playing an increasingly important role in transportation of oil and gas in the ocean. The pipe laying techniques and vessels are considered as critical and characteristic in its application. The paper introduces the characteristics of pipe laid vessels and the methods of laying pipeline. Based on ABS rules, give a specification of demands for general department, structure and outfitting and so on.
作者 诸虹
出处 《船舶工程》 CSCD 北大核心 2011年第4期8-11,共4页 Ship Engineering
关键词 深海铺管船 铺管方法 ABS规范 有限元方法 deepwater pipe laid vessel pipeline method ABS rule FEM
  • 相关文献

参考文献7

  • 1党学博,龚顺风,金伟良,李志刚,赵冬岩,何宁.海底管道铺设技术研究进展[J].中国海洋平台,2010,25(5):5-10. 被引量:38
  • 2ABS. Steel Vessel Rules 2008[S]. 2007.
  • 3ABS. Guide for Building and Classing Subsea Pipeline Systems[S]. 2006.
  • 4ABS. Guide for Building and Classing Subsea Riser Systems[S]. 2006.
  • 5ABS. Rules for Building and Classing Single Point Moorings[S]. 1996.
  • 6ABS. Guide for Building and Classing Floating Production Installations[S]. 2007.
  • 7Owen F. Hughes. Ship Structural Design[M]. S.N.A.M.E., 1988.

二级参考文献30

  • 1甄国强,胡宗武.铺设过程中海底管道的非线性分析[J].海洋工程,1993,11(3):28-38. 被引量:9
  • 2梁政.海洋管道“J”型铺设研究[J].中国海上油气(工程),1993,5(2):22-28. 被引量:9
  • 3帅健,吕英民,张进国.用动坐标迭代法分析海洋管道敷设时的应力[J].油气储运,1996,15(10):21-24. 被引量:9
  • 4Braestrup M, Andersen J, Andersen L, et al. Design and installation of marine pipelines [M]. Blackwell Science Ltd. , 2005, 210-238.
  • 5l.i Z G, Wang C, He N, et al. Overview of deepwater pipeline laying technology [J]. China Ocean Engineering, 2008, 22(3): 521-532.
  • 6Verner E A, Cheatham C A, Garrett D L, et al. Predicting motions of long towed pipe strings [C]. OTC 4666, 1984.
  • 7Binns J R, Marcollo H, Hinwood J, et al. Dynamics of a near-surface pipeline tow [C]. OTC 7818, 1995.
  • 8GONG S F, DANG X B, LI J C, et al. Mechanical analysis of submarine pipeline during off-bottom towing method [C]. China Ocean Engineering, 2009, 23(4): 645-656.
  • 9Meurs P F. Bottom tow pipeline installation [C]. National Conference Publication-Institution of Engineers, Australia, 1983, 83(4): 31-39.
  • 10Plunkett R. Static bending stresses in catenaries and drill springs [J]. Journal of Engineering for Industry, ASME, 1967, 89(1): 31-36.