摘要
在建的玉蒙铁路秀山隧道为I级高风险特长隧道,隧道进口为反坡施工,隧道内涌水量极大。通过长期的施工探索,摸索出了一套适合特长隧道快速施工的反坡排水设备配备。
Xiushan Tunnel of Yuxi-Mengzi Railway which is in construction is I-class high-risk long tunnel.The tunnel entrance is constructed as anti-slope tunnel.Water inflow in tunnel is great.Through long-term construction exploration,a set of anti-slope drainage equipment which adapts to the rapid construction of long tunnel is proposed.
出处
《交通标准化》
2011年第16期141-144,共4页
Communications Standardization
关键词
I级
高风险
反坡
排水
I-class
high risk
anti-slope
drain