潘口水电站面板堆石坝挤压边墙施工技术 被引量:2

Construction technology of crushing side wall at Pankou face slab rock fill dam
下载PDF
导出
摘要 混凝土面板坝上游坡面施工是控制坝体填筑进度和影响坝体质量的关键环节。混凝土挤压边墙施工技术是在垫层料的上游侧采用机械设备挤压而形成一道混凝土边墙,避免了传统工艺垫层料超填、斜坡碾压、削坡等繁琐工序,是面板堆石坝上游坡面施工的新方法。堵河潘口水电站上游坡面施工采用该技术,简化了垫层料的施工工序,加快了进度,将斜坡碾压改为垂直碾压,保证了垫层料填筑质量,取得了较好的效果。 Construction of upstream slope of concrete face slab rock fill dam is a key part in dam filling and quality control. Construction of concrete crushing side wall is crushing the upstream side of cushion material by machine to form a wall, and traditional cushion material filling back, slope rolling and slope cutting were avoided. This is new in construction of upstream slope of face slab rock fill dam and was adopted in Pankou hydropower station. It simplified the construction process and changed slope rolling to vertical rolling, guaranteed the filling quality and good effect.
作者 许东林 秦赫
出处 《大坝与安全》 2011年第3期53-55,61,共4页 Dam & Safety
关键词 潘口水电站 面板堆石坝 挤压边墙 Pankou hydropower station rock fill dam crushing side wall
  • 相关文献

参考文献4

  • 1DL/T5144-2001水工混凝土施工规范[S].北京:中国电力出版社,2002.
  • 2DL/T5157-1996,水工混凝土结构设计规范[S].湖北人民出版社,1997.
  • 3DL/T5150-2001水工混凝土试验规程[S].北京:中国电力出版社,2002.
  • 4DL/T5128-2009,混凝土面板堆石坝施工规范[s].

共引文献30

同被引文献9

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部