摘要
通过渭南市东雷抽黄大型灌溉泵站的更新改造设计,提出泵站在改造设计中应注意的几个重要环节,以期为其他大型灌排泵站的更新改造提供参考与帮助。
Through the rehabilitation design of the large pump station for Donglei Yellow River Pumping Irrigation Area in Weinan City,it is suggested that attentions should be paid to several key links during the rehabilitation design of pump station,hoping to provide reference and help for the upgrading of other large irrigation and drainage pumping stations.
出处
《西北水电》
2011年第4期77-79,共3页
Northwest Hydropower
关键词
泵站
更新改造
水泵选型
泥沙
东雷抽黄灌溉区
pump station
rehabilitation
pump type selection
sediment
Donglei Yellow River Pumping Irrigation Area