厦漳跨海大桥Ⅱ标主墩钢板桩围堰设计 被引量:11

Design of steel sheet pile cofferdam for the main pier of Xiazhang sea-crossing bridge mark Ⅱ
下载PDF
导出
摘要 厦漳跨海大桥主墩承台采用钢板桩围堰施工。介绍了其主墩承台的施工工艺,并从施工过程中的3个控制工况对其钢板桩、围檩及支撑进行了详细的设计计算;从基坑坑底涌砂,钢板桩最小入土深度及基坑抗隆起稳定安全系数3个方面对基坑的稳定性进行了验算。 The main piers of Xiazhang sea-crossing bridge are constructed by steel sheet pile cofferdam.This article introduces the construction technology of the main pier and expounds the design and calculation of the steel sheet pile and supporting in detail from three control conditions of the construction process.The three factors of The foundation pit stability is checked based on the burst from pit,the minimum depth in soil and pit heave-resistant stability safety factor.
作者 阮泽莲 吴炜
出处 《水运工程》 北大核心 2011年第8期24-27,共4页 Port & Waterway Engineering
关键词 承台 钢板桩 围堰 支撑 设计 基坑稳定性 bearing platform steel sheet pile cofferdam support design foundation pit stability
  • 相关文献

参考文献6

  • 1JTGD-602004公路桥涵设计通用规范[s].
  • 2TB10002.2-2005,铁路桥梁钢结构设计规范[S].
  • 3J461-2005,铁路桥梁钢结构设计规范[S].
  • 4JTJ215-1998,港口工程荷载规范[S].
  • 5GB50017-2003.钢结构设计规范[S].[S].,..
  • 6JTJ267-1998板桩码头设计与施工规范[s].

共引文献2173

同被引文献58

引证文献11

二级引证文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部