锦屏一级水电站坝基无盖重固结灌浆施工工艺探讨 被引量:11

Discussion on Construction Technology of Consolidation Grouting without Concrete Covering for Dam Foundation in Jinping 1 Hydropower Station
下载PDF
导出
摘要 锦屏一级水电站大坝由于基础层混凝土仓面面积大,温控要求严格、间歇期短,固结灌浆施工与坝体混凝土温控存在较大矛盾,主要采取无盖重固结灌浆加有盖重补强固结灌浆及引管的方式进行。主要就无盖重固结灌浆主要存在问题进行了分析和探讨。 In Jinping 1 hydropower station,because of large concrete surface of dam foundation,strict temperature control,short construction interval and the contradiction between consolidation grouting and concrete temperature control,both consolidation grouting without concrete covering and reinforced consolidation grouting with concrete covering were adopted.The paper analyzed and discussed the main problems of consolidation grouting without concrete covering.
出处 《探矿工程(岩土钻掘工程)》 2011年第8期56-58,63,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 水电站坝基 无盖重固结灌浆 锦屏一级水电站 dam foundation consolidation grouting without concrete covering Jinping 1 hydropower station
  • 相关文献

参考文献3

二级参考文献8

共引文献11

同被引文献38

引证文献11

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部