摘要
在超高层建筑核心筒施工中,液压爬模工艺日趋完善,该工艺具有施工速度快、工程质量好、成本低等特点。河北开元环球中心工程施工中,结合工程实际情况,合理安排施工工序,立体交叉作业,采用多种安全措施,处理细部节点,有效地利用了空间、时间、设备和人力资源,提高了劳动效率,加快了施工进度。
The process of hydraulic climbing formwork in the construction of core tube of super high-rise building is becoming perfect, it has such characteristics as fast construction, favorable engineering quality and low cost, etc. In the construction of Hebei Kaiyuan International Centre engineering, construction sequences are arranged reasonably to realize tri-dimensional cross construction, and multiple safety measures are adopted to treat detail nodes. Space, time, equipments and labors are effectively used to improve the labor efficiency and quicken the construction schedule.
出处
《建筑技术》
北大核心
2011年第9期797-800,共4页
Architecture Technology
关键词
超高层建筑施工
核心筒
液压爬模工艺
super high-rise building construction
core tube
hydraulic climbing formwork process