摘要
咸宁核电站厂场地平整工程回填以开挖弃料作填料,其填料岩性复杂,风化程度不均匀。介绍了开挖区强、中风化泥质粉砂岩和粉砂质页岩第一阶段碾压试验方法、过程和试验结论。
Excavation spoil is used as backfill materials for the leveling work of Xianning Nuclear Power Plant Project. The backfill materials have complex lithologic character and non-uniform weathering degree. An introduction was made on the method, procedure and conclusions of the lst-stage site rolling test conducted for the intense or middle weathered argillaceous siltstone and silty shale within the excavation area.
出处
《广西水利水电》
2011年第4期54-57,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
咸宁核电厂
场平工程
碾压试验
Xianning Nuclear Power Plant
leveling work
rolling test