摘要
矿山项目设计规模的确定涉及矿山的资源因素、技术因素、外部因素、市场及风险因素等,分析了矿山项目设计规模的主要影响因素,探讨了合理确定矿山项目设计规模的步骤与原理.
The design capacity of a mine project is mainly determined by such factors as resource,technology,market,risk,etc.This paper describes some major influencing factors for the design capacity of a mine project,and discusses the process and principle for deciding the design capacity.
出处
《有色金属科学与工程》
CAS
2011年第4期49-52,共4页
Nonferrous Metals Science and Engineering
关键词
矿山项目
设计规模
影响因素
mine project
design capacity
influencing factors