期刊文献+

基于利益相关者的工程项目主体行为风险研究 被引量:8

Research on Behavioral Risk of Participants in Construction Project Based on Theory of Stakeholders
下载PDF
导出
摘要 项目主体行为风险是指由于主体的特定行为而给项目造成损失的可能性。长期以来风险管理比较重视客观事件风险,计算风险发生的概率和可能损失,很少注重主体行为风险的影响作用,而项目工程风险产生的根源往往是由项目主体行为所引起的;同时,项目利益相关者对项目的期望值和价值观很大程度上决定了项目的成败。从利益相关者角度,提出了工程项目主体行为风险研究的理论框架和实践意义,对工程项目主体行为风险进行分类、识别和评价,并提出针对性的风险管理响应措施。 The behavioral risk of participants in construction project means the possibility of loss to the project because of participants' behaviors. Currently risk management has been commonly applied across the construction sector. However it rarely includes the effects of behavioral factors. But often behavior of participants is a major reason for project risks. Mean- while, a project' s success or failure is strongly influenced by how well it meets stakeholders' expectations and their perceptions of its value. The paper analyzes how construction practitioners perceive risk management and in particular behavioral risks factors from project stakeholders' perspectives. It also identifies and appraises behavioral risks so as to develop more effective risk reduction measures.
作者 何旭东
出处 《科技管理研究》 北大核心 2011年第19期207-210,共4页 Science and Technology Management Research
关键词 工程项目 项目主体行为风险 利益相关者 construction project behavioral risk of participants stakeholders
  • 相关文献

参考文献14

  • 1Hamedi J, Malekzadeh F, Niknam V. Improved production of erythromycin by Saccharopolyspora erythraea by various plant oils[J]. Biotechnology Letters, 2002,24:697-700.
  • 2BARNES M. A long term view of project management - its past and its likely future [M]. Berlin: 16th World Congress O, I Project Man- agement, 2003.
  • 3Raczynska B K, Ruczaj Z, Sawnor K D. Limiting reactions in activation of acyl units in biosynthesis of macrolide antibiotics[J]. Antimicrob Agents Chemother, 1973, 3:162-167.
  • 4Hunaiti A A, Kolattukudy O E. Source of methylmalonyl-coenzyme A for erythromycin synthesis[J]. Antimicrobiol Gent-Chemotherapy, 1984, 25:173-178.
  • 5Takao S, Takashi I, Masatoshi T. Purification and kinetic properties of butyryl-CoA synthetase from Paecilomyesces varioti[J]. Agric Biol Chem, 1987, 51:145-152.
  • 6Bradford R W. A rapid and sensitive method for the quantitation of microgram quantities of protein utilizing the principle of protein-dye binding[J]. Anal Biochem, 1976,72: 248-254.
  • 7THEVENRAN V, MAWDESLEY M J. Perception of human risk fac- tors in construction projects : an exploratory study [ J ]. International Journal of Project Management, 2004, 2 (22) : 131 -137.
  • 8Hunaiti A R, Kolattukudy P E. Isolation and characterization of an acyl-CoA carboxylase from an erythromycin-producing Streptomyces erythreus[J]. Arch Biochem Biophys, 1982, 216:362-371.
  • 9向鹏成,孔得平.工程项目风险研究新视角——工程项目主体行为风险[J].建筑经济,2010,31(3):72-75. 被引量:14
  • 10杨宝君.国际工程项目风险管理应研究的几个问题[J].技术经济,2003,22(12):47-48. 被引量:22

二级参考文献17

  • 1王晓州.建设项目委托代理关系的经济学分析及激励与约束机制设计[J].中国软科学,2004(6):77-82. 被引量:57
  • 2Barnes M.A long terra view of project management-its past and its likely future[C]. Berlin: 16th World Congress O, I Project Management, 2002.
  • 3ClelandD.I.,IrelandL.R.项目经理便携手册[M].欧立雄,等,译.北京:机械工业出版社,2002.
  • 4Thevendran V.,Mawdesley M.J. Perception of human risk factors in construction projects: an exploratory study [J]. International Journal of Project Management, 2004,22 (2): 131-137.
  • 5Au M.C.Y.,Chan E. H.W. Attitudes of contractors and employers towards transfer of a time-related risk in construction contracts [C]. Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress, 2005 : 691-703.
  • 6Chan E. H.W.,Au M.C.Y. Building contractors behavioural pattern in pricing weather risks[J].International Journal of Project Management, 2007,25 (6) :615-626.
  • 7Adams F. G. ,et al.Information asymmetry and competitive bidding in auditing[J].Economic Inquiry, 2005,43 (2) :417- 425.
  • 8Verma A., Terpenny J. Dynamic project management: a principal-agent based approach [C]. Atlanta: IIE Annual Conference and Exposition 2005.
  • 9Muller R. ,Turner J.R. The impact of principal-agent relationship and contract type on communication between project owner and manager [J] .International Journal of Project Management, 2005,23 (5): 398-403.
  • 10Medda F.A game theory approach for the allocation of risks in transport public private partnerships [J]. International Journal of Project Management,2007,25 (3): 213-218.

共引文献33

同被引文献116

引证文献8

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部