长引水隧洞安全监测设计关键技术初探 被引量:7

Key technology of safety monitoring of long diversion tunnel
下载PDF
导出
摘要 以某水电站长引水隧洞为依托,对施工期围岩变形、永久围岩变形和锚固应力等,以及跨沟明管段衬砌钢筋应力进行监测设计,从而针对长引水隧洞监测设计关键技术进行初步探讨。 Based on a long diversion tunnel of a hydropower station, the paper discusses the monitoring design for cofferdam deformation during construction period, permanent cofferdam deformation and rock bolt stress, and stress on the lining steel bars of the gullycrossing open pipe. Some key technology for monitoring long diversion tunnels is proposed, which provides a valuable reference for similar projects.
出处 《西北水电》 2011年第B09期5-7,14,共4页 Northwest Hydropower
关键词 长引水隧洞 收敛变形监测 跨沟明管段监测 安全监测 long diversion tunnel convergence deformation monitoring monitoring of gully-crossing open pipe safety monitoring
  • 相关文献

参考文献4

  • 1刘斌,傅金筑,王永宙,杨洋,李明刚,龚会志.橙子沟施工阶段围岩工程地质分类法初探[J].西北水电,2010(2):17-23. 被引量:3
  • 2DL/T5006--2007,水电水利工程岩体监测规程[S].北京:中国电力出版社,2009.
  • 3DLT5195--2004,水工隧洞设计规范[S].北京:中国电力出版社,2004.
  • 4张作光.瓦屋山水电站引水隧洞施工期围岩稳定性监测及支护结构优化研究[D],四川大学硕士学位论文,2006,5.

二级参考文献5

共引文献2

同被引文献36

引证文献7

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部