通过分析金沙江溪洛渡、向家坝水电工程建设中物资核销的难点,结合工程实践经验,提出了相应的控制措施,可供建设大中型水电工程借鉴。
Material write-off is an important link of handling of goods and materials.In this paper materials verification difficulties in the Xiluodu,Xiangjiaba hydropower project construction are analyzed.The control of the crisis is explored and countermeasures for reference of construction of large and medium hydropower projects are put forward.
出处
《水电与新能源》
2011年第5期62-64,共3页
Hydropower and New Energy
关键词
水电工程
物资管理
核销
对策
Hydropower projects
materials management
verification
solution