跨穗盐路斜拉桥桥塔墩承台深基坑施工方案优化 被引量:9

Optimization of Construction Scheme for Deep Foundation Pit of Pylon Pier Pile Cap of Cable-Stayed Bridge over Suiyan Road
下载PDF
导出
摘要 跨穗盐路斜拉桥采用对称独塔双索面塔梁固结体系,桥塔墩紧邻既有西环高速公路高架桥基础,桥塔墩承台采用钢板桩围堰法施工。为确保该桥支护结构的稳定性和西环高速公路高架桥的整体结构安全,结合实际情况,将原钢板桩施工方案优化为"局部旋喷桩+钢板桩"施工方案,并通过增设1道钢板桩围堰圈梁、2种方式布设旋喷桩及分层浇筑承台混凝土等措施,解决了紧邻既有桥梁深基坑施工难题,缩短了承台施工工期,节约了施工成本。 The Cable-Stayed Bridge over Suiyan Road employs a single pylon and double cable planes cable-stayed bridge with symmetric span arrangement and with rigid fixity of the pylon and girder.The pylon pier of the bridge is located closely at the foundations of the existing viaduct on the West Ring Expressway and the pile cpa of the pylon pier was to be construed by the steel sheet pile cofferdam method.To ensure the stability of the supporting structure of the bridge,the global structural safety of the adjacent viaduct and in consideration of the actual conditions at the construction site,the original construction scheme of the steel sheet piles was optimized as a new scheme of the local rotary jet grouting piles plus steel sheet piles.Also by adding a ring beam to the cofferdam and two ways of arranging the rotary jet grouting piles and concreting the pile cap in layers,the problem of construction of the deep foundation pit closely adjacent to the viaduct was hence resolved,the working time schedule for the pile cap was shortened and the construction cost was saved.
作者 王鹏 林雄
出处 《桥梁建设》 EI CSCD 北大核心 2011年第5期86-89,共4页 Bridge Construction
关键词 斜拉桥 铁路桥 基坑 施工方案 优化 桥梁施工 cable-stayed bridge railway bridge foundation pit construction scheme optimization bridge construction
  • 相关文献

参考文献7

二级参考文献10

共引文献2211

同被引文献73

引证文献9

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部