摘要 高土质心墙堆石坝采用砾质土作为心墙防渗料已成为发展趋势,砾质土的压实质量是施工控制的重点。目前常用于大坝防渗料填筑施工压实效果检测的几种控制方法的对比分析表明,采用三点击实法检测粒径小于20mm细料的压实度作为控制标准,全料的压实度作为复核标准是合适的。用优选的压实度检测方法对苗尾水电站防渗土料进行了碾压试验,并提出了其压实度控制标准的建议。 Using gravel soil as impervious core material for high rock-fill dams with earth core wall is becoming popular, and the compaction quality of gravel soil is the key of dam construction. After comparing the quality control methods of common compaction tests, it is practical to take the compaction degree of fine material with particle diameter less than 20 mm as quality control standard and the compaction degree of complete material as check standard by using three-point compaction test. By the rolling tests of impervious core earth material, the control standard of compaction degree is proposed for Miaowei Hydropower Station project.
出处 《水力发电》 北大核心 2011年第10期51-53,共3页 Water Power
关键词 碾压试验 三点击实法 防渗土料 苗尾水电站 compaction test three-point compaction impervious earth material Miaowei Hydropower Station
  • 相关文献

参考文献4

二级参考文献8

  • 1张宗亮.糯扎渡水电站工程特点及关键技术研究[J].水力发电,2005,31(5):4-7. 被引量:21
  • 2冯业林,孙君实,刘强.糯扎渡心墙堆石坝防渗土料研究[J].水力发电,2005,31(5):43-45. 被引量:14
  • 3DL/T5395-2007,碾压式土石坝设计规范[S].
  • 4刘兴宁,栗国忱,张永全,等.云南省澜沧江糯扎渡水电站招标设计阶段心墙防渗料碾压试验研究报告[R].2006.8.
  • 5钟登华,张社荣,刘东海,等.糯扎渡水电站粘土心墙堆石坝建设与监测信息管理系统研究开发总体技术方案[R].天津大学2007.8.
  • 6DI/T5129-2001碾压式土石坝施工规范[S].
  • 7胡晓阳.从土的压实机理分析心墙土料的压实质量控制[C]∥中国水电顾问集团华东勘测设计研究院.土石坝技术2005年论文集.浙江杭州:2006.2:262-266.
  • 8刘兴宁,袁有仁,冯业林,等.糯扎渡水电站施工详图设计阶段心墙堆石坝坝体填筑技术要求[R].2008,4.