期刊文献+

亭子口水电站跌坎消力池减压模型试验研究 被引量:2

Research on decompression model test of stilling basin with step-down floor of Tingzikou Hydropower Station
下载PDF
导出
摘要 采用1:40减压模型,通过测试流态、水下噪声和脉动压力等水力参数,对亭子口水电站闸墩尾部跌坎式底流消力池的空化空蚀特性进行了研究。成果表明:闸墩尾部区域存在强度为发展阶段的剪切流空化,采用8.00m高度的跌坎消力池后,消力池底板空蚀破坏的可能性较小;但消力池边墙与闸墩内壁侧扩距离较小时,边墙空蚀破坏的可能性较大;消力池边墙与闸墩内壁侧扩距离增至4.20m时,边墙空蚀破坏的可能性显著降低。 The decompression model of 1:40 was used to research cavitation and erosion characteristics of energy bottom-dissipation pool with step-down floor at the tail of sluice pier of Tingzikou Hydropower Station by hydraulic parameter test of flow pattern,underwater noise and fluctuated pressure and so on.The results show that the cavitation of shear flow at the bottom pier is in a developing stage,the possibility of cavitation erosion on the floor of pool is little when adopting 8 m energy dissipation pool with step-down floor;the cavitation damage of the side wall of energy dissipation pool is more likely to occur with the small distance between side wall of energy dissipation pool and internal wall of pier,and the possibility of cavitation damage of side wall is significantly declined when the distance increases to 4.20 m.
出处 《人民长江》 北大核心 2011年第21期40-41,69,共3页 Yangtze River
关键词 跌坎消力池 空化 溃泡脉冲 底孔 亭子口水电站 energy dissipation pool with step-down floor cavitation fluctuating pressure of bursting bubble bottom outlet Tingzikou Hydropower Station
  • 相关文献

参考文献4

二级参考文献14

共引文献112

同被引文献24

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部