期刊文献+

龙凤水电站坝基河床强夯试验研究 被引量:1

Experimental study on heavy tamping of riverbed for dam foundation of Longfeng Hydropower Station
下载PDF
导出
摘要 龙凤水电站坝基位于砂卵石层上,其覆盖层强度不满足设计要求。为节约工程费用,拟对其河床砂卵石坝基采用强夯措施来改善其工程特性。为验证设计指标并确定施工参数和质量控制标准,在现场进行了强夯试验研究。 As the foundation for the dam of Longfeng Hydropower Station is just located on a sandy gravel stratum, the strength of its coverage cannot meet the requirement of the design. For saving the relevant construction cost, the foundation treatment measure of heavy tamping is planned to be adopted to improve the engineering characteristics therein; for which an experimental study is made in situ, so as to verify the design indexes and determine both the construction parameters and the quality control standards concerned.
出处 《水利水电技术》 CSCD 北大核心 2011年第11期74-78,共5页 Water Resources and Hydropower Engineering
关键词 坝基处理 砂卵石基础 强夯试验 龙凤水电站 dam foundation treatment sandy gravel foundation heavy tamping experiment Longfeng Hydropower Station
  • 相关文献

同被引文献3

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部