The new structure of roller compacted concrete (RCC) arch dams is presented for extremely cold and earthquake prone areas. The influence of construction plans and improved materials on the stresses in the Taxi River dam is also given. Earlier impoundment of water is shown to not only benefit the engineering design but also improve the stresses during construction in winter. Low cement content in the concrete and artificial short joints improved the monolithic structure and the transmitted forces. The concrete plug installed in the first cooled part of the arch dam provides excellent force transmission in the arch, which increases the monolith of the earlier arch, reduces the increasing thermal stresses that occur later, and improves the deformation flexibility of the dam.
The new structure of roller compacted concrete (RCC) arch dams is presented for extremely cold and earthquake prone areas. The influence of construction plans and improved materials on the stresses in the Taxi River dam is also given. Earlier impoundment of water is shown to not only benefit the engineering design but also improve the stresses during construction in winter. Low cement content in the concrete and artificial short joints improved the monolithic structure and the transmitted forces. The concrete plug installed in the first cooled part of the arch dam provides excellent force transmission in the arch, which increases the monolith of the earlier arch, reduces the increasing thermal stresses that occur later, and improves the deformation flexibility of the dam.
基金
Supportedby"985"FundofTsinghuaUniversity(No.201010-004)