ANALYSIS AND DECISION OF A COAL TIPPLE

ANALYSIS AND DECISION OF A COAL TIPPLE
下载PDF
导出
摘要 The expected annual costs of loading operation of a coal tipple are ana-lyzed, and the loading of the trains and some factors in the system are studied. Sineethe arrival of the trains is uncertain, 3 probability models , uniform, normal and betadistributions,are used to simulate the arrival of the trains. With the aid of comput-er,the annual costs of the 3 distributions are found to be 103. 99 , 79. 09 and 72. 86million dollars, respectively. The trend is obvious. With the fixed arriving time ofthe standard trains,a plan is made manually. It shows that the cost is only 51. 33million, which is of the minimized value. We also set some principles in analyzingthe problem. They will be useful for some plan of a railroad system.
出处 《Journal of Southeast University(English Edition)》 EI CAS 1994年第1期48-57,共10页 东南大学学报(英文版)
关键词 PROBABILITY DISTRIBUTION MONTE Carlo METHOD probability, distribution, Monte Carlo method
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部