摘要
通过对脱硫吸收塔内五个区浆液的综合分析,讨论了石膏脱水系统环节的设计,结合天津第一热电厂脱硫工程,分析了各脱水设备在不同工艺流程中的选择条件,提出了一种湿法脱硫过程中浆液分配器的改进设计。
Based on comprehensive analysis on slurry content in wet flue gas desulfurization absorber,the design of dewatering process are discussed,and according to the wet flue desrlfurization project in Tianjin coal-fired power plant,selective principle of each dewatering device in various process are analyzed.Finally,one of an improvement and utilization of slurry distributive device are given.
出处
《电力科技与环保》
2011年第6期36-37,共2页
Electric Power Technology and Environmental Protection
基金
国家高技术研究发展计划(863计划)(408007)
关键词
湿法脱硫
多炉一塔
浆液分配器
脱水系统
WFGD
shared an absorber of multi-boilers
slurry distributive device
dewater system