摘要
基于对三峡发电量影响因素的分析,提出了较为符合实际中长期发电计划的计算方法,有助于提高发电计划制作的合理性、科学性、准确性,为正常运行期三峡水库发电的合理优化调度提供参考依据。
Based on the analysis made on the influence factors on the energy output of the Three Gorges Hydropower Station, a method for calculating a more feasible and practical mid-long term power generation plan is put forward herein, which is helpful to enhance rationality, science and accuracy for making the power generation plan concerned, and then provides a reference basis for reasonably optimizing the dispatch of the power generation with the Three Gorges Reservoir during the normal operation period as well.
出处
《水利水电技术》
CSCD
北大核心
2011年第12期88-92,共5页
Water Resources and Hydropower Engineering
基金
国家科技支撑计划(2009BAC56B03)
关键词
三峡电站
中长期发电计划
电量排频
发电风险
Three Gorges hydropower Station
mid-long term power generation plan
frequency analysis on energy output
power generation risk