期刊文献+

富水砂卵石地层中盾构隧道交叉重叠换边施工关键技术 被引量:7

Alternated Construction Technique Applied to a Shield-Driven Tunnel in a Water-Abundant Sandy Pebble Stratum
下载PDF
导出
摘要 在富水砂卵石地层中,盾构隧道交叉重叠换边施工尚属首次,为解决盾构掘进通过后地表不发生较大沉降、不对道路及管线造成破坏,在工程实施过程中采取了盾构掘进控制、地表注浆加固、洞内顶管注浆加固及施工监测指导施工的信息化施工技术,实践证明是比较成功的。 For the first time, the alternated construction technique is applied to a shield-driven tunnel in a water-abundant sandy pebble stratum. In order to avoid sizeable ground settlements and damage to roads and pipelines after shield driving, the information oriented construction techniques of shield driving control, ground grouting reinforcement, pipe-jacking grouting reinforcement and construction monitoring were applied. These measures proved to be effective and successful.
作者 王张亚
出处 《现代隧道技术》 EI 北大核心 2011年第6期150-154,共5页 Modern Tunnelling Technology
关键词 盾构隧道 富水砂卵石地层 交叉重叠 施工技术 Shield tunnel Water-abundant sandy pebble stratum Alternated construction Construction techniques
  • 相关文献

参考文献4

  • 1张凤祥.盾构遂道施工手册[M].北京:人民交通出版社,2005.
  • 2徐东.士力学[M].北京:中国建筑工业出版社,2006.
  • 3徐润洋,等.富水砂卵石地层土压平衡盾构施工关键技术[R].北京:中国铁道建筑总公司,2010.
  • 4任国青,黄鑫.盾构下穿西环铁路土桥立交桥安全专项方案[R].长春:中铁十三局集团有限公司,2010.

共引文献1

同被引文献61

引证文献7

二级引证文献45