摘要
针对水量变化大、占地面积有限的污水处理厂,设计采用了CASS与活性砂过滤池相结合的污水处理工艺。出水稳定达GB 18918—2002《城镇污水处理厂污染物排放标准》一级A标准。通过对各处理构筑物、设备布置的设计介绍,总结了该工程设计的经验和体会。
For variation in the flow of sewage and the limited area of the sewage treatment plant, a combination of CASS and active sand filter process was used in the design of wastewater treatment plant. The effluent can stably meet the first-order of "Municipal Wastewater Treatment Plant Pollutant Emission Standards"( GB 18918--2002). Through technological design of various structures and introduction to the arrangement of equipment, it is summarized the process characteristics and understanding in technological design
出处
《环境工程》
CAS
CSCD
北大核心
2011年第6期23-24,27,共3页
Environmental Engineering
关键词
污水处理
CASS
活性砂工艺
设计
wastewater treatment
CASS
active sand process
design