摘要
根据煤矿采掘计划编制的特殊性,应用网络优化技术,开发了采掘接替计划的计算机仿真系统,实现了煤矿工作面管理、计划管理和计划实施的实时仿真.系统分为工作面管理子系统、计划管理子系统和采掘动态仿真子系统.在主系统中,采用VB5.0编写主控程序,以及控制与管理对数据库、计划和图形的动态仿真.利用VC+ + ,OpenGL接口开发出供VB主控程序使用的ActiveX 控件,主控程序利用控件和数据库中的数据,通过编程实现动态图形仿真的目的.
According to the particularity of organizing mining excavation plan using network optimization technology, the computer simulation system was developed. The system can be used for real time simulation of working face management, plan management and plan accomplishmont. It consists of three sub systems, which are sub systems of working face management, plan management and dynamic mining excavation simulation. The VB5.0 was adapted to design the main controlling program, control and manage the database, plan as well as the dynamic simulation of the graph in the main system. ActiveX control for VB main controlling program was produced with VC++ and OpenGL. The dynamic simulation of graph was achieved with the help of the main controlling program, which makes good use of the control and the data in the database in the process of designing program.
出处
《中国矿业大学学报》
EI
CAS
CSCD
北大核心
2000年第1期30-33,共4页
Journal of China University of Mining & Technology
关键词
煤矿
采掘计划
计算机仿真
仿真系统
coal mine
mine mining excavation plan
computer simulation