摘要
无锡市梅村污水处理厂二期工程采用一体化MBR工艺,设计规模为3×104m3/d,工程于2009年2月正式投产。根据两年来的运行情况,分析了污水处理厂处理效果、电耗等,在此基础上介绍了膜组件的污染情况及清洗效果。
Integrative MBR process is adopted in the second-phase project of Meicun WWTP in Wuxi City with the design capacity of 3 ×10^4 m^3/d, and the project has been put into operation in February 2009. According to the operation situation of two years, the treatment effect and the power consumption are analyzed. On this basis, the fouling and cleaning effect of the membrane modules are introduced.
出处
《中国给水排水》
CAS
CSCD
北大核心
2012年第2期39-41,共3页
China Water & Wastewater
关键词
一体化MBR工艺
处理效果
电耗
膜组件的污染与清洗
integrative MBR process
treatment effect
power consumption
fouling and cleaning of membrane modules