摘要
简要分析了某地铁车站工程的特点以及施工重点和难点,详细介绍了HPE液压垂直插入工法在地铁车站施工中的应用,并给出新的技术对策,解决了钢管柱安装工艺落后的问题,为施工安全提供了保障。
This thesis briefly analyzes the features,construction points,and difficulties of the subway station engineering,specifically introduces the application of HPE hydraulic vertical insertion method in the subway station construction,and shows new technological countermeasures,which has solved the problem of backward installation technique of steel pipe column and has provided guarantee for construction security.
出处
《山西建筑》
2012年第5期109-111,共3页
Shanxi Architecture
关键词
地铁车站
盖挖逆作法
HPE工法
垂直度
subway station
cover and cut-top down
HPE construction method
verticality