期刊文献+

深水管汇设计方法及其在荔湾3-1气田中的应用 被引量:26

Design of Deepwater Manifold and Structure Design Study on Subsea Manifold for LW3-1 Gasfield
下载PDF
导出
摘要 水下管汇是海上油气开发的重要设备,深水中的管汇设计面临许多技术挑战。管汇处于深水中,环境条件比较复杂;内部承压很大;需要实现的功能多;整体布局形式复杂。针对管汇的结构进行了优化,设计了一个应用于南海荔湾3-1深水气田开发的6井槽水下管汇。完成了单井产气的汇集,化学药剂的分配及清管功能,还实现了相关的化学药剂注入控制功能,满足了荔湾3-1深水气田开发的需要。 Subsea manifold is important equipment for offshore oil and gas development.Design the manifold in the deepwater faces many technical challenges.Manifold in the deepwater,environmental conditions are very complex;the internal pressure is great;to achieve multi-function,the overall layout of the form is complex.The structure of manifold was optimized;a 6-well slot manifold was designed used in LW 3-1 gas field in the South China Sea.The manifold complete collection of single well gas,Chemical distribution and cleaning tube function,also the related chemicals into the control function was achieved.It can meet the needs of the development of LW3-1 gas field.
出处 《石油矿场机械》 2012年第1期24-29,共6页 Oil Field Equipment
基金 大型油气田及煤层气开发-海洋深水油气田开发工程技术项目"水下生产技术"课题(2008ZX05026-003) 国家科技重大专项"海洋深水油气田开发工程技术"资助子课题"水下管汇连接器样机研制"(2011ZX05026-003-02)
关键词 水下管汇 生产管线 设计 结构 应力分析 subsea manifold; production pipeline; design; structure; stress analysis
  • 相关文献

参考文献16

  • 1关小虎,张晓军,薛小强,熊智.橇装井口管汇装置的优化设计[J].石油矿场机械,2004,33(4):41-43. 被引量:6
  • 2顾永维,周美珍,王长涛.深水水下管汇主结构设计及计算方法研究[J].机械工程师,2011(2):134-135. 被引量:8
  • 3Higdon RL. Numerical absorbing boundary conditions for the wave equations[J]. Mathematics of Computation, 1987, 49(179) :65-90.
  • 4Liao ZP. A decoupling numerical simulation of wave motion [A], Dynamic Soil-structure Interaction [C]. Elsevier, Amsterdam, 1998. 125-140.
  • 5Lafitte J I., Perrot M, Lesgent J, et al. Dalia Subsea Production System: Presentation and Challenges [C]. OTC 18541,2007.
  • 6ISO13628 1. Petroleum and natural gas industries- Design and operation of subsea production systems [s].2010.
  • 7Aki K, Richard PG. Quantitative Seismology, Theory and Methods[ M]. USA: W. H. Freeman and Company, 1980.
  • 8Liao ZP. Extrapolation non-reflecting boundary conditions[J]. Wave Motion, 1996,24:117-138.
  • 9Eric J, Parker, Chiara Maria Traverso, et al. Vulnera bility of Subsea Structures to Geohazards Some Risk Implications[C]. OTC 20090,2009.
  • 10Speirs A P, Reichard R H, Lyle C R, et al. Execution of EPC Submarine Pipeline Projects in the Cantarell Field[C]. OTC 10861,1999.

二级参考文献6

  • 1GREGORY N, et al. Subsea Production System: An Overview [C]//OTC,30 April-3May 2001, Houston, Texas: 1-21.
  • 2ROBINSON R, et al Design Challenges of a 48-inch Pipeline Subsea Manifold [C]//OTC 5 May-8 May 2003, Houston, Texas : 1-7.
  • 3BARNAY G. The Subsea Production System Presentation and Challenges[C]//OTC 6 May-9 May 2002, Houston, Texas: 1-8.
  • 4Falttinsen O M.船舶与海洋工程环境载荷[M].杨建民,等译.上海:上海交通大学出版社,2008:169-172.
  • 5API RP 14E, DESIGN AND INSTALLATION OF OFFSHORE PRODUCTION PLATFORM PIPING SYSTEMS [S], 1984. 33-36.
  • 6ASMEB31.3-1990.化工厂和炼油厂管线:美国国家标准.[S].,1990..

共引文献14

同被引文献209

引证文献26

二级引证文献114

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部