楼板开角缝实现RC框架“强柱弱梁”效果的有限元分析 被引量:6

Finite element analysis of efficiency of slot-cutting around RC frame joint for "strong column and weak beam"
下载PDF
导出
摘要 利用有限元软件ADINA对一栋6层现浇钢筋混凝土框架结构的梁柱节点做了拟静力分析与地震动力反应分析,并对普通梁柱节点与周围楼板设角缝节点的结果对比。分析计算结果表明,对于普通梁柱节点,在梁柱节点处采用开角缝的措施之后,梁受力主筋屈服明显提前,柱混凝土裂缝明显减少,梁、柱塑性铰出现时间间隔增加。首层柱柱脚处塑性铰的出现延后,更加接近总体机制破坏。 A numerical quasi-static and dynamic earthquake response model was established with ADINA software for beam-column interior joint in a reinforced concrete frame.The results for traditional joint specified in design code and that for the joint with slot around were compared.It is shown that for the joint with slot around,the yielding time of beam reinforced bar will shift to an earlier time,while the number of cracks on column becomes less.The time interval between the occurrence of plastic pivot on beam and on column becomes longer,which exhibits a failure type closer to the beam-pivot mode.
出处 《地震工程与工程振动》 CSCD 北大核心 2012年第1期121-127,共7页 Earthquake Engineering and Engineering Dynamics
基金 国家自然科学基金项目(51078124)
关键词 梁柱节点 强柱弱梁 塑性铰 屈服 楼板开角缝 beam-column joint strong column and weak beam plastic pivot yield slot in floor
  • 相关文献

参考文献8

二级参考文献31

  • 1蒋永生,陈忠范,周绪平,鲁宗悫.整浇梁板的框架节点抗震研究[J].建筑结构学报,1994,15(6):11-16. 被引量:93
  • 2杨红,韦锋,白绍良,王珍.柱增强系数取值对钢筋混凝土抗震框架塑性铰机构的控制效果[J].工程力学,2005,22(2):155-161. 被引量:27
  • 3楼宝堂.中国古今地震灾情总汇[M].北京:地震出版社,1996..
  • 4苏幼坡.唐山震后恢复重建过程及启示[R].汶川地震建筑震害调查与灾后重建分析报告.北京:中国建筑工业出版社,2008:432-441
  • 5Pantazopoulou S J, French C W. Slab participation in practical earthquake design of reinforced concrete frames [J]. ACI Structural Journal, 2001, (7-8) :479-489
  • 6ACI 318-08. Building Code Requirements for Structural Concrete and Commentary [ S ]. American Concrete Institute, Detroit, MI, 2008
  • 7人民图片网[EB/OL].[2008-11-23].http://www.photobase.cn/PicInfo.php?covefid=388596
  • 8苏幼坡.钢筋混凝土框架结构抗竖向连续倒塌能力分析.结构工程师,2005,:462-467.
  • 9UFC 4-023-03. Design of Buildings to Resist Progressive Collapse[ S]. U.S. Department of Defence, 2005
  • 10Progressive collapse analysis and design guideline for new federal office buildings and major nodemization project [S]. U.S. General Services Administration,2003

共引文献644

同被引文献56

引证文献6

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部